T-Mobile

Project Type: Perimeter Wall, Flood Proofing

Project Description: This is a flood proofing project at a hybrid office/communications facility that was prone to chronic flooding in the Pacific Northwest.

Flood barrier system with bulkhead channel

Due to tight spaces, the flood protection system on this installation used primarily 10′ planks.

Flood barrier system - complex corner post

A custom three-way corner post with a fixed strut.

Flood barrier system - hold down clamps

Hold down clamps tighten the flood planks against the horizontal gaskets creating a watertight flood panel.

Flood wall team

A happy flood wall erection crew and a job well done.

Complex flood proofing configuration

This small closure configuration contains a corner post to allow for running the flood system to and away from the inner bulkhead, and also includes two bolt-on bulkhead channels.

Flood proofing door closure

These office doors have to open outward to conform to the local fire code.

Flood barrier system

The rear of the building contains a continuous run of the removable flood wall system.

Aluminum flood planks

The stop logs weigh only 5 pounds per lineal foot and are easily handled by office workers.

Flood wall system - bulkhead channel

Drilled-in anchors allow for a bolt-on channel.

Flood proofing door closure

These office doors have to open outward to conform to the local fire code.

Flood barrier system - compression channels

The tightening of the compression channels forces the stop logs against the vertical gaskets.

Get Free Consultation

See Our Story