Valley City

Project Type: Perimeter Flood Barrier, half wall

Project Description: With two projects in Valley City, ND, Flood Control America’s flood protection barrier system comprises over 12,000 Sq. ft. varying in height from 3′ to 12′.

Valley City - Removable Flood Barrier in half wall configuration and full height closure

Flood Barriers at full height transitioning to half wall on the dry side.

Temporary Flood Protection

Valley City - Removable Flood Protection Barrier in half wall configuration

An installation of Flood Control America flood barriers on top of concrete half wall from the wet side.

Valley City - Flood Wall embedded vertical channel

Flood Control America can fabricate embedded vertical channels at end connection to planks for flood control systems.

Valley City - Full height demountable flood wall closure

12′ high flood protection barrier closure transitioning to concrete wall, viewed from the wet side.

Valley City - Temporary flood wall barrier half post

Demountable flood protection barrier posts under 5′ do not require angle struts. A short cantilever fixed struts is all that is required. Note: Hold down clamps shown in photo are not fully engaged.

Valley City - Half wall removable flood barrier from dry side

FCA’s removable flood barriers can be installed on top of architectural half wall.

Valley City - Temporary Flood Barrier 7' high

7′ high full height flood control system with half wall installation in background viewed from the dry side.

Valley City - Temporary Flood Protection Walls at 12' in height

A 12′ high flood wall barrier installation with two diagonal struts installed.

Valley City - Hold down clamps seal removable flood barriers horizontally

Flood Control America’s hold down clamp system allows for temporary flood barrier installation to multiple heights.

Get Free Consultation

See Our Story